Carbon Capture System, Customized Design, Procurement, Construction, Modular Structure

Product Details
Customization: Available
After-sales Service: Online Service
Warranty: 1 Year

360° Virtual Tour

Diamond Member Since 2015

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001, ISO 9000, ISO 14001, ISO 14000, OHSAS/ OHSMS 18001, HSE
Terms of Payment
LC, T/T
  • Carbon Capture System, Customized Design, Procurement, Construction, Modular Structure
  • Carbon Capture System, Customized Design, Procurement, Construction, Modular Structure
  • Carbon Capture System, Customized Design, Procurement, Construction, Modular Structure
  • Carbon Capture System, Customized Design, Procurement, Construction, Modular Structure
  • Carbon Capture System, Customized Design, Procurement, Construction, Modular Structure
  • Carbon Capture System, Customized Design, Procurement, Construction, Modular Structure
Find Similar Products

Basic Info.

Certification
ISO, ASME
Application
Process System
Principle
CO2 Capture
Style
Modular
Material
system
Certificate
ISO9001, ASME API etc
Hex Fabrication Code
ASME VIII Div. I, API661, GB150
Delivery Time
According to Project Schedule
Warranty Period
12 Months6
Service Life
10 Years
Feature
High Capture Rate, High CO2 Purity
Scope of Supply
Design, Procurement, Construction
Structure
Modular Structure
Technology Partner
University of Zhejiang
Application Industries
Power Steels Cement, Oil and Gas
Transport Package
on Request
Specification
customized according to work condition
Trademark
Wintech
Origin
Shandong, China
HS Code
8419500090
Production Capacity
900 Sets/Year

Product Description

Global business leaders have pledged to achieve carbon neutrality as early as 2030 and are taking action. With the passage of time, these target dates are getting closer and closer, and we will help you embark on your carbon emissions journey with advanced technology and a professional team.

Wintech Company collaborates with Zhejiang University to undertake the 13th Five Year National Science and Technology Project on the application technology of chemical absorption CO2 capture and storage. At present, the first domestic power plant flue gas carbon dioxide capture project has started construction at Shenhua Jinjie Power Plant.


Wintech  C capture system technology Advantage: 

a carbon dioxide capture rate greater than 90%
a purity greater than 99.9%. 
it is optimized with the process system and fillers to efficiently and low-cost complete carbon capture.



Scope of Supply:   Design, Procurement and Fabricating, Construction


Warranty period: 6 months after equipment acceptance or 12 months after equipment delivery, whichever comes first.
Equipment performance guarantee period requirement: at least 10 years after acceptance.




Carbon Capture System, Customized Design, Procurement, Construction, Modular Structure

Technology partner introduction:

Carbon Capture System, Customized Design, Procurement, Construction, Modular Structure

Zhejiang University, located in Hangzhou, Zhejiang Province, is a comprehensive National Key Universities directly under the Ministry of Education of the Ministry of Education of the People's Republic of China, ranking among the national "double first-class", "Project 211" and "Project 985"
In November 2022, it ranked sixth in the 2023QS Asian College and university rankings.

In June 2023, the 2024QS World College and university rankings was released, and College and university rankings ranked 44th.

 

Industries with significant emission reduction challenges are embarking on the path of decarbonization

such as:


power
steels
cement
industry
Refining and Petrochemical

We understand your work style and the complexity of your production, and are always ready to help you achieve carbon neutrality together


Project photos: 

 

Carbon Capture System, Customized Design, Procurement, Construction, Modular StructureCarbon Capture System, Customized Design, Procurement, Construction, Modular Structure




COMPANY PROFILE
Carbon Capture System, Customized Design, Procurement, Construction, Modular Structure

Shandong Wintech Technology Co., Ltd.  is engaged in engaged in the design, fabrication, installation and commissioning of specialised heat exchange equipment, required by the oil and gas, petrochemical engineering, chemical industry, waste incineration plant, food processing plants and other engineering undertakings. The company is capable of fabricating products in accordance to major international codes or specifications in carbon steel, stainless steel, alloy and non-metallic materials.

Two scientific research centers were cooperated with universities:
1. Technology-Wintech Thermal Technology Research Institute, cooperated with Qingdao University of Science.
2. Wintech Carbon Dioxide Capture Research Laboratory, cooperationed with Zhejiang University.

 

• More than 30 experienced engineers, who will present the tailor-made project scheme of heat exchanger. 
• supplier of SINOPEC, PetroChina, SONNC CNOOC and National Power.
• Heat exchanger supplied to Evironment Engineering companies for denitration and desulfurization systerm.


TECHNICAL TEAM
Carbon Capture System, Customized Design, Procurement, Construction, Modular Structure
PRODUCTION WORKSHOP
Carbon Capture System, Customized Design, Procurement, Construction, Modular Structure









 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier