All Welded Plate Type Air Preheater Installed for Blast Furnace Waste Heat Recovery System for Steel Refinery and Waste Incineration Plant

Product Details
Customization: Available
After-sales Service: 12 Months
Warranty: 12 Months

360° Virtual Tour

Diamond Member Since 2015

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001, ISO 9000, ISO 14001, ISO 14000, OHSAS/ OHSMS 18001, HSE
Terms of Payment
LC, T/T
  • All Welded Plate Type Air Preheater Installed for Blast Furnace Waste Heat Recovery System for Steel Refinery and Waste Incineration Plant
  • All Welded Plate Type Air Preheater Installed for Blast Furnace Waste Heat Recovery System for Steel Refinery and Waste Incineration Plant
  • All Welded Plate Type Air Preheater Installed for Blast Furnace Waste Heat Recovery System for Steel Refinery and Waste Incineration Plant
  • All Welded Plate Type Air Preheater Installed for Blast Furnace Waste Heat Recovery System for Steel Refinery and Waste Incineration Plant
  • All Welded Plate Type Air Preheater Installed for Blast Furnace Waste Heat Recovery System for Steel Refinery and Waste Incineration Plant
  • All Welded Plate Type Air Preheater Installed for Blast Furnace Waste Heat Recovery System for Steel Refinery and Waste Incineration Plant
Find Similar Products

Basic Info.

Certification
ISO, ASME
Application
Heater, Cooler
Material
Steel
Plate Material
SS304 316L, C-276 254smo
Tube Material
Silicon Glass Silicon Carbide
Working Temperature
800 C
Function
Flue Gas Denitrification
Functioning
Flue Gas Desulfuration
Feature
Anti Dew Point Corrosion
Lead Time
Within 60 Days
Plate Thickness
0.8~2mm
Free Wanranty
12 Months
Manufacturing Standard
ASME VIII Section I
Standard
GB150
Transport Package
Plywood Case
Specification
customized
Trademark
Win-tech
Origin
Zibo, China
HS Code
8419500090
Production Capacity
800 Sets/Year

Product Description


All Welded Plate Type Air Preheater Installed for Blast Furnace Waste Heat Recovery System for Steel Refinery and Waste Incineration Plant









The converter steelmaking process is based on molten iron, scrap steel and ferroalloy as the main raw materials. Without the help of external energy, it relies on the physical heat of molten iron and the chemical reaction between the components of molten iron to generate heat. Converter fume and dust refers to the brown fume emitted in the process of converter blowing. It is a mixture of burner gas and fume, which is mainly composed of nitrogen oxides and carbon monoxide, and also a small amount of carbon dioxide and trace amounts of other high-temperature gases and fume. In order to effectively control the air pollution caused by flue gas oxynitride, new medium temperature or low temperature denitrification devices and GGH devices for flue gas waste heat recovery are needed in steelworks.

All Welded Plate Type Air Preheater Installed for Blast Furnace Waste Heat Recovery System for Steel Refinery and Waste Incineration Plant









High temperature denitration and purified flue gas heats the low temperature side raw flue gas, then flows into the subsequent denitration device, recycling the excess heat and heating the raw flue gas at the same time, overcoming the problems existing in the traditional light tube or finned tube heat exchanger structure such as uncompact  structure, high consumption of pipes. At the same time, as the flue gas contains large amount of dust, the fin tubes are easy to get blocked and it is not easy to clean when dust is accumulated. Denitration device adopts the plate structure of preheater. The distribution of flue gas flow inside the plate is even. The running resistance of linear flow along the plate of flue gas is small. The reasonable design of flow design between plates make it not easy to cause ash fouling. Specially designed plate type improves flue gas turbulence kinetic energy and at the same time reduce the ash fouling adhesion, further enhancing heat transfer efficiency. Both online and offline cleaning can be set according to the working condition, which will reduce equipment maintenance replacement cycle and prolong the service life.

All Welded Plate Type Air Preheater Installed for Blast Furnace Waste Heat Recovery System for Steel Refinery and Waste Incineration Plant






All Welded Plate Type Air Preheater Installed for Blast Furnace Waste Heat Recovery System for Steel Refinery and Waste Incineration Plant
All Welded Plate Type Air Preheater Installed for Blast Furnace Waste Heat Recovery System for Steel Refinery and Waste Incineration Plant



All Welded Plate Type Air Preheater Installed for Blast Furnace Waste Heat Recovery System for Steel Refinery and Waste Incineration Plant



Other types of heat transfer equipments we manufacture:

All Welded Plate Type Air Preheater Installed for Blast Furnace Waste Heat Recovery System for Steel Refinery and Waste Incineration Plant
All Welded Plate Type Air Preheater Installed for Blast Furnace Waste Heat Recovery System for Steel Refinery and Waste Incineration Plant

Loading from factory:

All Welded Plate Type Air Preheater Installed for Blast Furnace Waste Heat Recovery System for Steel Refinery and Waste Incineration Plant
All Welded Plate Type Air Preheater Installed for Blast Furnace Waste Heat Recovery System for Steel Refinery and Waste Incineration Plant
All Welded Plate Type Air Preheater Installed for Blast Furnace Waste Heat Recovery System for Steel Refinery and Waste Incineration Plant




FAQ

1. Q: Do you manufacture by yourselves?
A: Yes. We are manfacturer and supplier with ASME for foreign market in China.

2.Q: How can we get the quotation asap?
A:  The heat exchanger,air preheater is designed and supplied by customers' operating condition on the plant site.We will design the HE technical data immediately once getting the operation condition from you, and supply quotation to you asap. 

3.Q:  What operation data do you need from us for the quotation?
A : 1. Working  temperature
     2. Working Pressure
     3. What's the lowing medium in heating and cooling pass.
     4. MOC of equipment
     5. Required size.
     6. Required quantity
     7. Other specified data

4.Q:What is the MOQ? 
A:MOQ is one complete set of equipment.

5.Q:How does your factory do quality control? 
A:Quality is priority ,we make relevant strict testing before delivery 
Our factory has already obtained ISO9001 quality and ISO 14001 
Environmental management system certificate.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier