The converter steelmaking process is based on molten iron, scrap steel and ferroalloy as the main raw materials. Without the help of external energy, it relies on the physical heat of molten iron and the chemical reaction between the components of molten iron to generate heat. Converter fume and dust refers to the brown fume emitted in the process of converter blowing. It is a mixture of burner gas and fume, which is mainly composed of nitrogen oxides and carbon monoxide, and alsoa small amount of carbon dioxide and trace amounts of other high-temperature gases and fume.In order to effectively control the air pollution caused by flue gas oxynitride, new medium temperature or low temperature denitrification devices and GGH devices for flue gas waste heat recovery are needed in steelworks.
High temperature denitration and purified flue gas heats the low temperature side raw flue gas, then flows into the subsequent denitration device, recycling the excess heat and heating the raw flue gas at the same time, overcoming the problems existing in the traditional light tube or finned tube heat exchanger structure such as uncompact structure, high consumption of pipes. At the same time, as the flue gas contains large amount of dust, the fin tubes are easy to get blocked and it is not easy to clean when dust is accumulated. Denitration device adopts the plate structure of preheater.The distribution of flue gas flow inside the plate is even.The running resistance of linear flow along the plate of flue gas is small. The reasonable design of flow design between plates make it not easy to cause ash fouling.Specially designed plate typeimproves flue gas turbulence kinetic energy and at the same time reduce the ash fouling adhesion, further enhancing heat transfer efficiency. Both online and offline cleaning can be set according to the working condition,which will reduce equipment maintenance replacement cycle and prolong the service life.
Other types of heat transfer equipments we manufacture:
Loading from factory:
FAQ
1. Q: Do you manufacture by yourselves?
A: Yes. We are manfacturer and supplier with ASME for foreign market in China.
2.Q: How can we get the quotation asap?
A: The heat exchanger,air preheater is designed and supplied by customers' operating condition on the plant site.We will design the HE technical data immediately once getting the operation condition from you, and supply quotation to you asap.
3.Q: What operation data do you need from us for the quotation?
A : 1. Working temperature
2. Working Pressure
3. What's the lowing medium in heating and cooling pass.
4. MOC of equipment
5. Required size.
6. Required quantity
7. Other specified data
4.Q:What is the MOQ?
A:MOQ is one complete set of equipment.
5.Q:How does your factory do quality control?
A:Quality is priority ,we make relevant strict testing before delivery
Our factory has already obtained ISO9001 quality and ISO 14001
Environmental management system certificate.
Supplier HomepageProductsair preheaterWelded Plate Type Air Preheater Installed for Blast Furnace Waste Heat Recovery System for Steel Rolling and Waste Incineration Plant