Structural drawing of variable spring support and hanger
Type of variable spring support and hanger
Installation of variable spring supports and hangers
The positioning load before delivery is the installation load, which is marked with a blue arrow. The load during operation after installation is the working load, and the position is marked with a red arrow.
According to the pipe rack number, pipe line number, specification and model, install according to the above figure. After the installation is completed and the hydrostatic test is qualified, remove the positioning block.